Blog List

Friday, 16 June 2017

Prefabricated Timber Façade for the Energy Refurbishment of the Italian Building Stock: The Ri.Fa.Re. Project

Published Date
Available online 21 November 2016.

Author
Giada Malacarne. Author links open the author workspace.Opens the author workspaceOpens the author workspacea. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceGabriele Pasetti Monizza. Author links open the author workspace.b. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceJulia Ratajczak. Author links open the author workspace.a. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceDaniel Krause. Author links open the author workspace.a. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceCristina Benedetti. Author links open the author workspace.a. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceDominik T. Matt. Author links open the author workspace.a. Numbers and letters correspond to the affiliation list. Click to expose these in author workspaceb. Numbers and letters correspond to the affiliation list. Click to expose these in author workspace
a
Fraunhofer Italia Research S.c.a.r.l., Bolzano 39100, Italy
b
Free University of Bolzano-Bozen, Bolzano 39100, Ital
Abstract

This paper describes the Ri.Fa.Re. timber-based solution, an innovative timber-based prefabricated panel for the energy refurbishment of the existing Italian buildingś façades. Although similar technologies have already been tested in several European countries, they are not feasible to be used in the Italian context characterized by specific geometric features of the building stock and by seismic constraints which are not relevant for most of European countries. Moreover, this research does not aim only at developing a product but also at adopting a new process, based on parametric design and lean construction principles. The main outcome of this project is a concrete kit for energy refurbishment suitable for the Italian context, including: a) a technological prefabricated but customizable product and b) a more efficient process to decrease time and cost wastes during the whole process.

Keywords
energy refurbishment technologies
timber technologies
prefabrication strategies
construction process optimization

References
[1]
Benedetti C (edited by), Risanare ĺesistente. Soluzioni per il comfort e ĺefficienza energetica. Bolzano University Press, 2011.
[2]
Ma Z, Cooper P, Daly D, Ledo L, Existing building retrofits: Methodology and state-of-the-art, Energy and Buildings, 2012. p. 889-902.
[3]
Krause D, Matt DT, Bullinger S, Rauch R, Schlanke Prozesse in Baunetzwerken – Studie des Südtiroler Innovationsnetzwerks build4future. Fraunhofer Verlag, 2012.
[4]
Lattke F, Larsen KE, Ott S, Cronhjort Y, TES EnergyFaçade –prefabricated timber based building system for improving the energy efficiency of the building envelope, www.tesenergyfacade.com, 2011.
[5]
K.E. Larsen, F. Lattke, S. Ott, S. WinterSurveying and digital workflow in energy performance retrofit projects using prefabricated elementsAutomation in Construction (2011), pp. 999-1011
[6]
Literature database of Bestfacade project, http://www.bestfacade.com/textde/05_results_gesamt.htm, 2007.
[7]
I. Ballarini, S.P. Corgnati, V. CorradoUse of reference buildings to assess the energy saving potentials of the residential building stock: The experience of TABULA projectEnergy Policy (2014), pp. 273-284
[8]
Corrado V, Ballarini I, Corgnati SP, Building Typology Brochure – Italy. Fascicolo sulla Tipologia Edilizia Italiana, EPISCOPE project report, 2014.
[9]
Jabi W, Parametric Design for Architecture, Laurence King, 2013.
[10]
Ente Italiano di Normazione, UNI/TS 11300-1: Prestazioni energetiche degli edifici - Parte 1: Determinazione del fabbisogno di energia termica dell’edificio per la climatizzazione estiva ed invernale.
[11]
Ente Italiano di Normazione, UNI/TS 11300-2: Determinazione del fabbisogno di energia primaria e dei rendimenti per la climatizzazione invernale, per la produzione di acqua calda sanitaria, per la ventilazione e per l’illuminazione in edifici non residenziali.
[12]
Ente Italiano di Normazione, UNI/TS 11300-3: Determinazione del fabbisogno di energia primaria e dei rendimenti per la climatizzazione estiva.
[13]
Ente Italiano di Normazione, UNI 10351: Materiali e prodotti per edilizia - Proprietà termoigrometriche - Procedura per la scelta dei valori di progetto.
[14]
Ente Italiano di Normazione, UNI EN ISO 10456: Materiali e prodotti per edilizia - Proprietà igrometriche - Valori tabulati di progetto e procedimenti per la determinazione dei valori termici dichiarati e di progetto.
[15]
http://wufi.de/en/literature/.
[16]
Schweizer W, Value stream engineering – Five Paradigms for Process Design in Industrial Engineering, 21st International Conference on Production Research, 2011.
[17]
Rother M, Shook J, Learning to see: value-stream mapping to create value and eliminate muda, Lean Enterprise Institute, Cambridge MA, 2004.
[18]
Forbes LH, Ahmed SM, Modern Construction. Lean Project Delivery and Integrated Practices, CRC Press, 2011.
[19]
Ordinanza PCM 3274 del 20/03/2003, Allegato 2.
[20]
Dallasega P, Matt DT, Schweizer W, Krause D, Value Stream Engineering – A case study of process optimization for the supply chain of window installation, Sustainable procurement in urban regeneration and renovation Conference, 2013.
Peer-review under responsibility of the organizing committee of the SBE16 Tallinn and Helsinki Conference.
For further details log on website :
http://www.sciencedirect.com/science/article/pii/S1876610216307809

No comments:

Post a Comment

Advantages and Disadvantages of Fasting for Runners

Author BY   ANDREA CESPEDES  Food is fuel, especially for serious runners who need a lot of energy. It may seem counterintuiti...